Dry time for epoxy before mbase coat

shaggyzr2

Promoted Users
How long should I wait to spray base coat over epoxy? I put down two wet coats unreduced, let flash 30 minutes between coats, temps in the upper 70s to low 80s, baked in the sun for about 6 hours and wet sanded the following day.
 
Last edited:
Back
Top