D
Doubled33
Searched and it seems to be a case by case for heat.
I will be spraying epoxy in a booth with heat.
My goal is to dry the parts enough so they can be handled from the booth back to my shop within a few hours.
How Long and what temperature should the heat be at?
Does this do away with the 65 degree minimum for 24 hour requirement?
when can the body filler process start?
Does heat to dry change any of the other trigger times such as 7 days no scuff and up to 30 with scuff?
I will be spraying epoxy in a booth with heat.
My goal is to dry the parts enough so they can be handled from the booth back to my shop within a few hours.
How Long and what temperature should the heat be at?
Does this do away with the 65 degree minimum for 24 hour requirement?
when can the body filler process start?
Does heat to dry change any of the other trigger times such as 7 days no scuff and up to 30 with scuff?