shine
Member
i dont do a lot anymore but would still like to get my 5ton plumbed and working .
2 plenums down each side of lift and one down the side of my booth. just in case i have something to do during the summer. build room already has ac . but this heat is a no go shop hit the pool thing. pushing 108 today. few more days and i can get back at it.
2 plenums down each side of lift and one down the side of my booth. just in case i have something to do during the summer. build room already has ac . but this heat is a no go shop hit the pool thing. pushing 108 today. few more days and i can get back at it.