I know this has been discussed many times, but when I need to find the subject information, I seem to have trouble.
I know unreduced epoxy is usually stated as 7 days max, what's the minimum to top coat?
When reduced, does the amount of reduction come into play? Tech manual says reduce 10-50% and then basecoat in 2 to 48 hours. Is that true for both 10% reduced and 50% reduced?
And the 10% to 50% is in relation to the total mixed amount? I.e. if you mix 1:1 epoxy and activator to total say 12 ozs, 10% is 1.2 ozs and 50 % would be to add 6 ozs?
Are the times to single stage the same as basecoat?
I know unreduced epoxy is usually stated as 7 days max, what's the minimum to top coat?
When reduced, does the amount of reduction come into play? Tech manual says reduce 10-50% and then basecoat in 2 to 48 hours. Is that true for both 10% reduced and 50% reduced?
And the 10% to 50% is in relation to the total mixed amount? I.e. if you mix 1:1 epoxy and activator to total say 12 ozs, 10% is 1.2 ozs and 50 % would be to add 6 ozs?
Are the times to single stage the same as basecoat?