V
vaccin
I have 2 rubber tubes running in the A Pillar that are tight.
I have hot work on the top of the pillar to complete .
Is there a way to lower them Say half way Then pull them back up. 1 is a sunroof drain and the other sunroof vaccuum with an OD of almost 3/4 in.
Access to the opposite ends of these tubes is not easy either.
Any experience with these.:lemo:
I have hot work on the top of the pillar to complete .
Is there a way to lower them Say half way Then pull them back up. 1 is a sunroof drain and the other sunroof vaccuum with an OD of almost 3/4 in.
Access to the opposite ends of these tubes is not easy either.
Any experience with these.:lemo: