MP&C
Member
Well, we have the new engine dropped in place.
....and she decided on fuel injection over the 770 CFM Holley (still new in the box). Of course this meant and O2 sensor bung on an already finished H-pipe. The bung that came with the FI Tech kit matched well to the outside radius of the exhaust pipe, but was rectangular in shape, and included a gasket for a "clamp installation"... As we aren't having any of that nonsense, the bung found it's way into the lathe, where a round outer perimeter will serve better for our TIG welded installation..
And after some touch up at the powder coaters....
Next, our arm rest enclosures for the rear seat needed a base for the padded arm rests. So Jake used the Go Kart slick to add some radius to 14 gauge cold rolled steel in order to match the enclosure...
.....and trimmed to fit....
These will be held in place with Mopar style door panel retainers, so we can still have ready access for any future maintenance on window mechanisms.
....and she decided on fuel injection over the 770 CFM Holley (still new in the box). Of course this meant and O2 sensor bung on an already finished H-pipe. The bung that came with the FI Tech kit matched well to the outside radius of the exhaust pipe, but was rectangular in shape, and included a gasket for a "clamp installation"... As we aren't having any of that nonsense, the bung found it's way into the lathe, where a round outer perimeter will serve better for our TIG welded installation..
And after some touch up at the powder coaters....
Next, our arm rest enclosures for the rear seat needed a base for the padded arm rests. So Jake used the Go Kart slick to add some radius to 14 gauge cold rolled steel in order to match the enclosure...
.....and trimmed to fit....
These will be held in place with Mopar style door panel retainers, so we can still have ready access for any future maintenance on window mechanisms.