B
bmxpegan411
Hi Guys,
I'm getting ready to final sand my doors and there will be a few spots of slick sand showing through, but sanded down smooth with say 600 (it's on top of epoxy)
If this is the case will 1 coat of epoxy 1:1:1 be enough, or should I do two and give it a day? I'm worried that the epoxy will seep into the slick sand and show in the final product.
I'm getting ready to final sand my doors and there will be a few spots of slick sand showing through, but sanded down smooth with say 600 (it's on top of epoxy)
If this is the case will 1 coat of epoxy 1:1:1 be enough, or should I do two and give it a day? I'm worried that the epoxy will seep into the slick sand and show in the final product.