H
HIG
Zack and I have finally finished welding the patch panels into the floor and makings some misc. patch panels that were needed. We sprayed the final coat of epoxy on the bottom of the tub yesterday and used the bedliner for the first time today. I was very happy with the way everything went of but course I had a question and wasn't sure how long to wait between coats so I called the tech line and as always Barry was very helpful and told me to start spraying it on and stop when it's gone. (I could wait if I wanted to but didn't need to).
Here's the some pics:
Epoxied:
1 gallon of bedliner:
Here's a few before shots:
Driverside done:
I am so Thankful for the great products SPI sells and the service they provide and also for this site where I know I can find great information from knowledgeable people, no snake oils BS just the proper way to do it.
Now the next big question is if we spray the inside of the tub black or mix SPI red base into it to match the exterior.
Thanks again, Steve
Here's the some pics:
Epoxied:
1 gallon of bedliner:
Here's a few before shots:
Driverside done:
I am so Thankful for the great products SPI sells and the service they provide and also for this site where I know I can find great information from knowledgeable people, no snake oils BS just the proper way to do it.
Now the next big question is if we spray the inside of the tub black or mix SPI red base into it to match the exterior.
Thanks again, Steve