When you fill the 1/4 to roof section which was originally leaded, do you just lay the piece right over the seam and weld it up? That's what it looks like but I'm just making sure, might be doing something similar soon.
When you fill the 1/4 to roof section which was originally leaded, do you just lay the piece right over the seam and weld it up? That's what it looks like but I'm just making sure, might be doing something similar soon.
I have to do much the same with my 69. Doubt it'll turn out at this level though. I'll bookmark this page to use as reference of how it should be done.